Jones assisted in the specification and budgeting efforts with the design team and General Contractor. Jones was awarded design/build based upon conceptual design package bid. Jones worked with the design team to develop all specifications, engineering and executed a fixed price contract for the work. Jones Was responsible for completing interior and exterior branding with signage and specialty design elements. Over 1,000 custom signs, integrated lighting, outdoor digital video displays, and a signature marquee blade sign with 20ft x 20ft vintage ghost neon head. Jones used a Trimble laser survey system to stencil the world’s largest cartoon graphic, the Little Caesars pizza logo figure spanning thousands of square feet across the arena dome. We assisted theCM develop specifications and budgeting which advanced to the engineering of the signs, their supports and their mounting methods.This project reached the LEED Certification Level of Silver.
Jones Sports' preconstruction services played a central role in the Little Caesars Arena project. Prior to putting the contract out for bid, we were brought in to assist in developing the project specifications and budget for this home of the Detroit Pistons. Jones Sports worked with the design team and general contractor to create a conceptual design package and ultimately won the design/build contract.